JDS DrainageFeb 28, 2019Old Water Main ReplacementThis job was to supply and install approx 45m of new 63mm poly main, due to the existing water main being in very poor condition and kept...
JDS DrainageNov 13, 2018New Water Main InstallationThis job was to supply and install a new mdpe 28mm water main. We excavated a trench from the property boundary up to a point of entry up...
JDS DrainageNov 1, 2018New Water MainA new water main was required at my customer's property. I excavated a 900mm deep trench from the property boundary up to the side of the...
JDS DrainageMay 16, 2018Water main repairThis job was to find the source of a leaking water main. We cut a square in the tarmac with a petrol spinner and broke out with a small b...
JDS DrainageApr 2, 2018Leaking Water MainWe had to find and fix a 25mm watermain pipe which had been leaking for some time. We excavated down to a depth of 500mm to find the leak...