My customer required 4 new gullies to take rainwater from the roof.
After installing the 4 gullies and concreting in, I dug a trench to a suitable depth and ran new pipework from the gullies down to the intercepter manhole at the front of the property.
Once all pipework was in and connected into the chamber, I surrounded all pipework in 10mm shingle and backfilled up to level, finishing with black dye concrete to finish.
Comments