JDS DrainageDec 8, 2023Grease blockageWe were called initially to clear a storm system which was reported to be blocked. Upon inspection we found a chamber full up to the top...
JDS DrainageOct 5, 2023Defective Foul PipeDue to a defective foul pipe, we were called to carry out an excavation to expose the fault and construct a new chamber. We used a large...
JDS DrainageJan 6, 2022Pipework replacement This job was to carry out an excavation onto a 3m section of pitch fibre pipework that was badly deformed and blistered. We carried out...
JDS DrainageJan 6, 2022Re-route of storm water systemFor this job we were instructed to re-route a storm water pipe that had collapsed underneath the building. We carried out an excavation...