This job was to supply and install and new plastic kitchen gully due to existing clay being in poor condition and causing constant blockages.
We broke out old gully and dug down to remove. Once removed the gully, we dug back onto the clay pipework and connected the new gully on to it. Once connected, concrete was used to surround the new gully and pipework up to level.
Then backfilled and reinstated up to existing levels and finished off with new 1”1/2 plastic pipework from the sink into the gully.