top of page
  • Writer's pictureJDS Drainage

Storm Water Soakaway


JDS Drainage - Gully construction
JDS Drainage - Gully construction

This job was to connect an outlet pipe for a storm water gully in a car park area which when heavily rained on would cause flooding.


We excavated from the gully out to a woodland area where the new soak away was constructed.


Once the trench had been dug we then laid 100mm underground pipework connecting it from the gully into the soakaway.


Once the pipework had all been laid and connected then proceeded to backfill and reinstate up to existing levels.


JDS Drainage - Soakaway construction
JDS Drainage - Soakaway construction

bottom of page