My customer required a new gully to take away the rainwater from a roof.
I excavated down to a clay foul pipe, cut a section out and installed a plastic 100mm t-piece to connect the new pipe with the existing.
The new gully was then set in concrete, backfilled up to level and finished with black dye concrete.
Comments