top of page

Soil Stack Reconfiguration

  • Writer: JDS Drainage
    JDS Drainage
  • Sep 22
  • 1 min read

Our customer was experiencing water leaking into the shop below, and so we were asked to reconfigure and move the stack higher.


We started by cutting out and removing the existing pipework and replaced with new 110mm grey waste pipe, complete with new clips. We then had to reconfigure the 2” and 1.5” waste pipes and reconnect them at suitable points of the main stack.


 
 
 

Comments


bottom of page