Water Main Installation

Using our specialist moling equipment, we can install a new water main, or divert an existing run, without the need for an extensive excavation.

Instead, a series of small pits are dug up to 25 meters apart, and our 'mole' vibrates itself from one pit to another, pulling the new water main pipework along with it. 

Only in extreme circumstances would full excavation be required. 

Case Studies

© JDS Drainage 2020